Skip to content
Sunpowers.in Industrial Solar 100 kW to 2 MW

Industrial Solar

Sunpowers • LucknowFree site survey • Quote in about 30 minutes
Add to cart

Products for your plant

Loading products from the store…

Factory solar

Power your plant from your own roof or land

We build industrial plants from 100 kW to 2 MW on factory sheds or open ground, and help with approvals. For sites with no space, open access lets you source solar from a plant elsewhere.

Both CAPEX (you own the plant) and OPEX style options are possible. We share expected payback after studying your bill.

Why industrial solar

What you gain

Large savings

Factories run many hours a day, so solar offsets a big share of the bill.

Heavy-duty build

Shed mount and ground mount structure made for wind and long life.

Monitoring

Remote monitoring and logger so you can see generation every day.

Flexible models

CAPEX or OPEX, rooftop, ground, zero export or open access.

Industrial • 100 kW–2 MW

Factory ke liye kai option

Factory shed, khali zameen ya gaon me solar park — TopCon 615W+ panel, 30 saal performance warranty, heavy duty structure.

On-Grid net feeding — roof / ground

Shed / ground→Panel array 615W+→String inverter 100 kW+→Net feeding meter→Factory load
  • Factory shed ya zameen par 100 kW–2 MW
  • Shed mount me lagbhag 6,500 sq ft per 100 kW
Add to cart

On-Grid Solar

Loading products from the store…

Zero export device — factory fast

Panel 615W+ 1 MW→Inverter cluster→Zero export (smart CT + PLC)→Factory LT panel
  • CT se load naap kar inverter ko real-time signal — grid export zero

Open access — gaon se factory tak

Solar park (gaon) 2 MW→33 kV line→DISCOM wheeling→Factory (shahar)
  • Factory me jagah nahi? Solar gaon me lagaayein
TypeMeteringApprovalJagah / 100 kWKiske liye
Net feeding roofNet feeding~30 din6,500 sq ftFactory shed
Ground mountNet feeding~30 din1 acre / 250 kWKhali zameen
Zero exportNo export2–3 din6,500 sq ftFast install
Open accessWheeling~45 dinGaon me 1 MW+Jagah nahi

Commercial aur industrial solar par sarkari subsidy nahi hai — subsidy sirf Residential On-Grid / Hybrid me 1–30 kW par ₹1.08 lakh tak* (Kendra + UP Rajya). *Sarkari niyam ke hisab se badal sakti hai.

Questions

Questions

?How long until the plant pays for itself?

Often in around three years for factories, but it depends on your tariff and usage. We calculate it for your site.

?Do I need a lot of space?

About 6,500 sq ft for every 100 kW on a shed. If you lack space, ask about open access.

Ready to go ahead?

Check price and packages in the store, fill the form, or message us on WhatsApp.

Go to Store WhatsApp