100 kW Solar Plant: Cost, Roof Area, Generation and Savings
A common size for factories, colleges and cold stores.
Sunpowers+91 96210 50636 · sunpowers.inA 100 kW plant has about 180–190 panels of 540 W. Planning numbers are below; your site survey gives the real figures.
| Item | Indicative |
|---|---|
| Cost | ₹38 – 48 lakh |
| Roof area | 6,500 – 10,000 sq ft |
| Units per year | 1,30,000 – 1,50,000 |
| Saving at ₹7–10 per unit | ₹9 – 15 lakh a year |
| Payback | about 3 – 5 years before tax benefits |
Details on our 100 kW cost page. Read factory ROI and zero export and three-phase systems.
What connection does a 100 kW plant need?
It is usually connected at three-phase LT or HT depending on your sanctioned load; the DISCOM confirms.
How long does it take?
Installation takes some weeks after approvals.
Get a free solar site visit in Uttar Pradesh
Our team checks your roof, sizes the system, explains the subsidy and gives a written quote. No pressure.
Keep reading
1 MW Solar Power Plant: Cost, Land or Roof Needed and Output
Large-scale solar for industries and institutions.
Read more →Rooftop Solar for Factories in Uttar Pradesh: ROI, Savings and Risks
A practical way to decide on a 100 kW to 1 MW rooftop plant.
Read more →Solar for Factories, Shops and Hospitals in Uttar Pradesh: Savings and Process
Cut a large part of your daytime electricity cost with a rooftop plant.
Read more →